North Drainage Underpass Design

Share on Facebook Share on Twitter Share on Linkedin Email this link

Consultation has concluded

Update: On August 1, 2017, City Council approved Design Option 2. Take a look at the selected design in the Document Library. Thanks for your participation!

The City is currently in the process of designing the North Drainage Underpass at Bullhead Gulch in Steel Ranch. The new underpass will be located between Centennial Drive and Wagon Way under the BNSF railway. We want to hear your thoughts on the two preliminary designs! Do you have a preference? What do you like? What don't you like?

Update: On August 1, 2017, City Council approved Design Option 2. Take a look at the selected design in the Document Library. Thanks for your participation!

The City is currently in the process of designing the North Drainage Underpass at Bullhead Gulch in Steel Ranch. The new underpass will be located between Centennial Drive and Wagon Way under the BNSF railway. We want to hear your thoughts on the two preliminary designs! Do you have a preference? What do you like? What don't you like?

CLOSED: This discussion has concluded.
Discussions: All (1) Open (0)
  • Comments from the Community

    over 4 years ago
    Share on Facebook Share on Twitter Share on Linkedin Email this link
    CLOSED: This discussion has concluded.

    You need to be signed in to add your comment.

    What do you think about the preliminary design options? What do you like? What don't you like? Click on the document library to the right to review the design options.

    Replies Closed